My rule of thumb is that anybody who solely uses the unit of power for battery storage like "12 GW" is a moron and should not be part of the discussion at all. Peak output of storage is not the hard problem, the overall capacity is.

I had to look into several sources to check what we are talking about. Here is Bellefield solar + storage that claims to have battery storage of 1 GW output for whole 4 hours for overall capacity of 4 GWh. California consumes 259 TWh of electricity per year, Texas uses 365 TWh. Even if the output of this battery was infinite, it could power California or Texas for around 8-10 minutes. You would literally need thousand of such storage sites to cover potential output loss for one week.

Sabine Hossenfelder had a good video about economics of nuclear power here. She specifically investigates two claims: that it is slow and that it is expensive. Her counterarguments are as follows:

  • The overall building time varies from project to project and country to country. In Japan the median construction time is 4 years and 3 months with record being Kashiwazaki-Kariwa unit 6 built only in 39 months and finished in 1996. There is nothing intrinsic in nuclear power for it to be built slowly as is proven by very recent history.

  • As for price, using levelized cost of energy the nuclear supposedly pricier but only by factor of 2 or 3 compared to the cheapest gas power plants. The biggest disadvantage of nuclear is huge capital cost upfront with related cost of financing the capital. Here the construction time is very important as pouring billions of dollars that sit idle for years or decades ramps up the costs significantly, it may be around 30% of the cost for a project that takes 7 years to finish.

Nevertheless I looked into cost for electricity of two latest finished nuclear power plants. The Olkiluoto-3 power plant that provides Finland with 12TWh or around 15% of electricity a year caused significant drop of electricity cost in Finland to the level of around EUR 60 per MWh. The latest Mochovce 3 reactor also started in 2023 in Slovakia , which together with two older nuclear reactors provides 55% of electricity in the country will help local energy company to fulfill the promise of keeping the electricity price at the level of EUR 61 per MWh.

The biggest advantage of Nuclear is that you can build it where you need it and connect it to the old infrastructure providing good base load of energy. No new grids needed. You have to shell out onetime payment for construction and then you are fixed for decades to come. Which may also be a good thing as was shown during the peak of gas crisis where energy prices exceeded EUR 200 per MWh due to sky-high costs of gas. Additionally it is hard to undersell the benefit of energy independence from volatile countries such as Russia or Middleast even for backup gas plants. And another addition, to me the high upfront capital costs are actually a good feature in a sense - you can build the power plant and then have very low operating costs. But more importantly the revenue from the electricity goes into homegrown industry be it construction companies and other high-tech industry while operational costs also support high-skilled operators of this huge projects at home as opposed to buying solar panels from China or even worse sending money to Russia or terrible petroregimes in Arab world or Africa.