site banner

Friday Fun Thread for July 7, 2023

Be advised: this thread is not for serious in-depth discussion of weighty topics (we have a link for that), this thread is not for anything Culture War related. This thread is for Fun. You got jokes? Share 'em. You got silly questions? Ask 'em.

2
Jump in the discussion.

No email address required.

Work was kicking my ass the last month. But that finally ended, so I got out to my workshop to finally frame a fun map I got.

The Algorithm thought I would be interest in Lord of the Maps, and I was. Purchased a nice map of my state around Father's Day. But I skimped on the frame. $70 for a frame? Fuck that, I can probably build one at least as good, right?

Took me a month to get around to it, but I eventually did. I didn't do anything too fancy. Milled down the red oak cause I had plenty on hand, I let it get out it's movement in my shop for about two weeks, but it actually didn't move any more. So I cut it to final dimensions. Put a slight 15 degree chamfer on the inside edge because I saw someone else do it and I liked it. Then I worked it with some aged barrel stain. I did also do some splines on the corners to reinforce the relatively weak glued miter joints.

A few things happened. My miter gauge must have been a fraction of a degree off, because the miter joints in aggregate opened ever so slightly towards the outside after I glued the whole thing up. So I guess I'll be recalibrating that. I calibrated it when I got it, but I suppose I didn't do a good enough job. The second thing that happened was the stain was slightly blotchy in a few places where I may have left it on too long. A lot of cleaned up well when I hit it with some mineral spirits, but some of it didn't. Oh well. Next time. In retrospect, I'm not sure I'm pleased with how the splines turned out either, and I might use small dowels next time.

The cost breakdown is insane compared to a store bought frame. I used probably $8 worth of red oak, the 16x20 glass pane was also $8. I used about $2 worth of hardboard for the backing, and then it used pennies worth of stain, glue and brad nails. So about $18 all told, versus $70 ish.

Nice.

About how much time did you spend? That’s where I’d expect the store to take their cut.

Hrrrm. Maybe half an hour one Sunday doing the initial milling, then another afternoon a different Sunday to finish the project.